Oran Park Podium Retaining Wall System

Oran Park Podium 3A Stage 3A-DD

Oran Park Podium 3A Stage 3A DD Project Background: This project involved the construction of multiple retaining wall systems tailored to meet the client’s specific needs and high design expectations. A key requirement was the use of double-faced walls, designed to enhance both the functionality and the visual appeal of the site. Each wall was […]

Oran Park Podium 3A Stage 3A-DD Read More »

Marsden Park Warehouse MSE Reinforcement

Marsden Park Warehouse

Marsden Park Warehouse Project Background: The Marsden Park project involved preparing the site for a new warehouse pad. A key focus was coordinating inground services, especially in areas with Mechanically Stabilised Earth (MSE) reinforcement, to provide a stable foundation for the warehouse. A major part of the project was addressing the challenges of the site’s

Marsden Park Warehouse Read More »

Heathwood Concrete Sleeper Retaining Wall System

Heathwood

Heathwood Project Background: We were engaged to design and construct a 7-metre-high double-tier concrete sleeper retaining wall (4m top, 3m bottom) supported by deep bored piers and oversized galvanised steel posts. The project was initiated due to the failure of an existing wall supporting a neighbouring property. As removing the old wall was not feasible,

Heathwood Read More »

Beachmere MagnumStone Retaining Wall System

Beachmere

Beachmere Project Background: We were engaged to install a MagnumStone retaining wall system along the Lake Edge and the northern wall of a large-scale development. Spanning 723 lineal metres and covering approximately 2,695 square metres, the retaining wall reached a maximum height of 5.2 metres. The primary objective was to provide essential structural support while

Beachmere Read More »

Burpengary In-Situ Concrete Headwalls

Burpengary

Burpengary Project Background: Our team was engaged to construct in-situ concrete headwalls and retaining walls as part of an upgrade to the emergency road crossing. The works involved extending the existing headwalls adjacent to the culverts to support infrastructure upgrades, while maintaining the functionality of the existing drainage system. Challenges: A key challenge was safely

Burpengary Read More »

Kings Coast Stage 4 Masonry Retaining Wall System

Kings Coast Stage 4

Kings Coast Stage 4 Project Background: We were engaged to construct a masonry retaining wall system supported by screw pile foundations. The scope of works included the installation of 120 screw piles, construction of reinforced concrete footings, and the laying of masonry blocks with capping. The project was delivered as a full package, surrounding site

Kings Coast Stage 4 Read More »

Shortland Waters Seniors Living – Precinct 5

Shortland Waters Seniors Living – Precinct 5 Project Background: At Shortland Waters, we built inter-allotment walls for a new retirement subdivision, defining lot boundaries and ensuring structural stability. The AB Vertica NFC wall system was chosen for its strength and ability to meet the grading requirements of the project. Challenges: The main challenge was working

Shortland Waters Seniors Living – Precinct 5 Read More »

John Hunter Hospital and Innovation Precinct Retaining Walls

John Hunter Hospital and Innovation Precinct

John Hunter Hospital and Innovation Precinct Project Background: We were engaged to construct retaining walls using AB Vertical MSE, AB Vertical NFC, and split-face masonry systems to support the development of new link roads into the hospital. These walls needed to provide strong and durable foundations for critical infrastructure. Challenges: The project involved constructing 9m-high

John Hunter Hospital and Innovation Precinct Read More »